We use cookies to provide you with the best possible user experience. If you continue to use the site without changing your cookie settings, we assume you are fine with our cookies and the way we use them. The cookies store information about how you use our website, and help you use some of the functions on the site. Our cookies do not store any sensitive information, and we never use your cookies for targeted advertising. If you want, you can change your computer’s settings so that it does not accept cookies. We have information here on how you can do that.
Find solutions by project type.
Enogex standardizes construction drawing packages for its gas gathering compressor stations, reducing design and drafting time by 85% and project delivery time by 25%.
Ausenco uses Promis.e to develop an integrated approach that automates processes and significantly reduces engineering hours across all global projects.
Capital Engineering & Research Incorporation Ltd. used Bentley applications to create a digital model of innovative new power generation technology, which generates power 60% more efficiently than similar generators.
Ausenco seamlessly brings together disparate teams from across three countries to create a process for future project management and engineering projects.
DESEIN procured and transformed an existing gas-based power plant into a combined cycle plant, improving energy efficiency by 45-50%, and power generation capacity in Delhi, India.
Kavin Engineering and Services builds materials in Malaysia and assembles them in Iraq to save significant work on site at power plant project.
Soyuzhimpromproekt used Bentley technology to create an information model of a new plant, enabling parallel work that reduced design time by 25 percent.
Southern Company saves USD 560 million by ruling out dry scrubber in favor of natural gas conversion, using Bentley software to compare design costs.
ProjectWise – AutoPLANT integration enables efficient workflows for savings on Southern Company’s retrofit of five coal-fired electrical generation units.
Genesis saved two months on a 1.5-year schedule by implementing Bentley software to deliver 54 megawatt expansion at Burkina Faso power plant.
Suncor Energy developed an Information Plant for its refinery in Edmonton to provide timely, reliable information to operations and maintenance personnel.
MWH’s wastewater treatment project in the United Kingdom becomes one of the first European plants to be energy self-sufficient.
Profarb designed and fabricated a PLN 7.1 million alkyd resin production facility to manufacture 7000 tons per year of resin from sunflower oil in Smolensk, Russia.
Melbourne Water used Bentley design tools to integrate delivery-team members on four continents for design of advanced tertiary treatment plant.
Pall delivered the INR 55 million Panipat Refinery Jet-pulse Blowback Filtration System piping deliverables within two weeks of the start of modeling.