Behind the world's infrastructure

An open ecosystem of engineering software, data, and AI for the people who make infrastructure possible.

Save 20% through Dec 4

New Virtuoso subscriptions only. Use code CYBER26.

Buy now

Software engineered for today's demands.

Clarity in design. Resilience in operations. Performance and capacity at scale.

Deep expertise where it matters most.

Decades of engineering expertise, shaped by the realities of each industry we serve.

View industries
  • Cities and Government

    Modernize public infrastructure with connected data and AI-powered digital twins to deliver safer, more resilient communities.

  • Energy

    Modernize critical energy infrastructure to improve grid reliability, project delivery, and resilience.

  • Facilities

    Build and operate safer, more resilient facilities with connected BIM, 4D planning, and digital twins.

  • Transportation

    Coordinate complex networks from planning through operation to deliver projects faster, and keep assets performing longer.

  • Mining

    Combine subsurface and operational insight to reduce geotechnical risk, accelerate delivery and maximize uptime.

  • Water

    Plan and operate resilient water systems that protect supply, reduce risk, and improve network performance.

Purpose-built for every discipline and phase.

The software infrastructure professionals rely on to design, build, and operate with confidence.

Explore all products
  • ProjectWise

    Starting at

    $312.00 USD

    Infrastructure project delivery software

  • MicroStation interface showing a 3D model of a control tower.

    MicroStation

    Starting at

    $2,656.00 USD

    Infrastructure CAD software for 2D and 3D design

  • 3D geotechnical finite element analysis in PLAXIS 3D showing soil-structure interaction for a tunneling project.

    PLAXIS 3D

    Starting at

    $11,675.00 USD

    3D geotechnical finite element analysis software

The latest news and perspectives.

Ideas, insights and updates from Bentley and across the infrastructure community.

Subscribe for updates

Infrastructure depends on the people who get it right.

Behind them is Bentley.