September 08, 2020

Engineered Solutions: BIM Methodology Helps Design the World’s Longest Double-Decker Bridge, Saving Time and Costs

Press Coverage

Informed Infrastructure, USA

Read the article
Bentley Public Relations

Christine Byrne
Director, Media Relations
1-203-805-0432

Contact Bentley PR