AECOM Going Digital
With Bentley
Intersection and Improvements Project: A USD 35 million highway and railway intersection redevelopment project in Florida to remove an at-grade railroad crossing and construct a new 355-foot-long pedestrian bridge, widen an existing bridge, and add two new ramp bridges.
WHAT WAS THE OUTCOME?
- AECOM developed an integrated 3D model of all proposed roadways and ramps to visualize all aspect of the design and improve decision-making. Read the full case study
- ProjectWise allowed AECOM to significantly increase efficiency through effective collaboration among a multidiscipline project team distributed across the state.
- The multidiscipline solution enabled AECOM to meet the project requirements to minimize the impact on environmentally sensitive areas, the railroad corridor, and the adjacent neighborhood.

“Going Digital for AECOM is about leveraging the tools we use to their maximum capability.”
AECOM SVP Design Consulting Services,
Surface Transportation


