“The SYNCHRO platform helps the Lane Construction Corporation have access to all our project level data. Our Field and Corporate Managers, along with the Executives who lead them, now have timely access to critical business information through SYNCHRO. It is access to this information that helps forward-looking decision making improve.

Our industry has been far too reliant on backward looking reports and analysis. It is time to start looking ahead and planning for success. SYNCHRO helps us make a plan we can rely on.” – Andy Kaiyala, Lane Construction Corporation

“Bentley’s SYNCHRO 4D helped us nail costly mistakes in BIM design, avoid errors in schedule preparation and site area utilization, and eliminate time clashes and illogical activities. 

“SYNCHRO 4D provides us with an opportunity to simulate construction, preventing errors and mitigating risks bound to engineering, procurement, and construction.” –  Mikhail Mushurov, Renaissance Heavy Industries

“We chose SYNCHRO because it offered our team a full solution… SYNCHRO 4D enabled our planners to visually create a construction program from design information and validate any missing information. SYNCHRO Control ensured that all project updates met the latest design information, as well as gave us the ability to interconnect multiple models.

SYNCHRO Field gave our team access to information in the field and allowed site ops to access any program changes at the touch of a button on their mobile devices.” – Tom Denby, SKANSKA UK

SYNCHRO Free 30-Day Trial

SYNCHRO solves your construction pain points and gets time on your side

SYNCHRO Field

SYNCHRO Field

Field Management

Your mobile solution to effortlessly document project data on the job site, including notes, photos, and videos. Access all project documents in the field, and handle inspections, RFIs, custom forms, PDFs and more. 

All project data captured in SYNCHRO Field pushes directly into SYNCHRO Control.

SYNCHRO Control

SYNCHRO Control

Project Management

Your project management solution for all project data, documents, analysis, and insights in one place so project goals can be reached faster. It connects all project teams to one central hub to access and analyze data in real-time and in full project context.

Scale with SYNCHRO
Custom Tools to Connect Field to Office

SYNCHRO FIELD
SYNCHRO FIELD

SYNCHRO Field is a mobile solution that solves your field execution challenges…

  • Documents to the field
  • 4D models to the field
  • RFIs, photos, daily logs
  • Track observations
  • Flag issues​
  • Model-based progress tracking
  • Quality and quantity inspections
  • Work plans to the field
SYNCHRO CONTROL
SYNCHRO CONTROL

SYNCHRO Control is a web solution for document, data and task management, ensuring full team collaboration…

  • Includes all of SYNCHRO Field features, including… 
  • Document management
  • Model-based workflows
  • Issue and RFI management
  • Map and location services
  • 4D web model collaboration
  • Inspections management
  • Work plans to the field
A blue diagram displays the SYNCHRO logo and text, with two sections: "SYNCHRO Field" labeled as Field Management and "CONTROL" labeled as Project Management. Try our 30 Day Free Trial to experience seamless project control and field management.

Ready to close communication gaps from field to office?

Effortless Digital Construction Project Delivery

improve the quality, safety, and productivity of your heavy civil projects

SYNCHRO 4D icon

Find Everything in One Place

One platform for a single source of project truth – speeding up team collaboration and decision-making.
SYNCHRO Field icon

Collaborative Tools Built for Heavy Civil

The strongest tools in field and office so you can drive maximum project efficiency and get the job done.

SYNCHRO Control icon

Make Field Reporting Painless

Close communication gaps between your teams in field and office with automated data capturing and accessing.

A computer monitor displaying a green icon as part of its infrastructure.

Leverage Project Data In-Context

Full visibility on project standing and performance so your team gets the right information at the right time to stay on track and budget.

Screenshot of a SYNCHRO Control project management dashboard displaying a weather forecast, task list with critical issues, and navigation menu. The weather forecast shows temperatures ranging from 72°F to 77°F. Enjoy a 30 Day Free Trial to experience seamless project coordination.

Get Your 30-Day Free Trial of SYNCHRO!

“The SYNCHRO platform helps the Lane Construction Corporation have access to all our project level data.

“Our Field and Corporate Managers, along with the Executives who lead them, now have timely access to critical business information through SYNCHRO. It is access to this information that helps forward-looking decision making improve.

Our industry has been far too reliant on backward looking reports and analysis. SYNCHRO helps us make a plan we can rely on.”

– Andy Kaiyala, Lane Construction Corporation

“We chose SYNCHRO because it offered our team a full solution…

“SYNCHRO Control ensured that all project updates met the latest design information, as well as gave us the ability to interconnect multiple models.

“SYNCHRO Field gave our team access to information in the field and allowed site ops to access any program changes at the touch of a button on their mobile devices.”

– Tom Denby, SKANSKA UK

Ready to take the next step?

Contact one of our SYNCHRO experts and see how we can help you better understand how to solve your project’s needs.