Get To Know the Rail Construction Planning Solution
The Rail Construction Planning Solution provides rail and transit owner-operators and specialist contractors with the ability to advance beyond traditional deliverables, such as moving from PDFs to 3D/4D model-based workflows, and enhance collaboration between design and construction teams.
Explore the Benefits
Single source of truth for all your project needs
Increase safety and minimize risks
Improve communication and coordination
Optimize project plans and resources
Minimize unknown field conditions
Reduce waste and promote sustainable projects
Discover the Capabilities
Electronic Data Capture in the Field
Extend the value of the 4D model into the field for status checks, work planning and inspections.
3D/4D Construction Focused Planning and Collaboration
Leverage model-based workflows and cloud technology to create a secure, single source of truth that aligns design and construction for better project outcomes.
4D Construction Modeling, Visualization, and Simulation
Turn linear design models into construction models to improve the use of data and to better optimize project plans, schedules, and resources.
Cost Projection and Automated Quantity Takeoffs
Utilize 4D workflows to break horizontal projects into constructible components with auto-calculated quantity takeoffs (QTO) for more accurate cost projections.
Hear from our Users
ACCIONA Helps Modernize Melbourne’s Rail Infrastructure by Removing Dangerous Level Crossings
SYNCHRO Helps Drive Digital-first Approach to Reduce Construction Staging Time and Ensure a Safe Work Environment
Tasked with removing dangerous level crossings and constructing new stations in Melbourne, Australia, ACCIONA knew a fully digital approach was key to delivering successful planning, design, and project delivery. The project required meticulous and efficient planning, design, and project delivery—and temporarily shutting down rail lines and stations. ACCIONA leveraged Bentley to drive a digital-first approach that reduced construction staging time by 67% and ensured a safe work environment.
PT Wijaya Karya Develops High-speed Rail to Bring Reliable Public Transit to Indonesia
Bentley’s Open Applications and Digital Twin Technology Accelerate Construction Schedule
The USD 7.8 billion project stretches 143 kilometers in length and features 55 subgrade sections,13 tunnels, 46 bridges, and four integrated central stations. When complete, it will reduce congestion and cut the journey time between the two cities from three to 10 hours by automobile. By streamlining workflows and improving efficiency and design quality, PT Wijaya Karya saved USD 185 million in construction costs and shortened the schedule by six months.
Check out these Resources
Download this infographic to discover why rail and transit owner-operators and specialist contractors are adopting 3D/4D design delivery and construction planning.
Check out this e-book to learn more about the capabilities and benefits that you’ll gain with the rail construction planning solution.
Download this playbook to discover the steps you can take to implement 3D/4D model-based workflows on your next infrastructure project.
Connect people and data to optimize construction
Build infrastructure projects you’re proud of with the
Rail Construction Planning Solution