
Eliminate the friction between your design teams
Model track, bridges, tunnels, and electrification systems in a unified 3D environment to resolve conflicts on screen, not on site.
Your cart is empty
Browse our products and add items to your cart.
Items added to your cart
Your items have been saved.
View and edit your selections by proceeding to your cart.
Industries we empower
Solve & connect
Your cart is empty
Browse our products and add items to your cart.
Items added to your cart
Your items have been saved.
View and edit your selections by proceeding to your cart.
Industries we empower
Solve & connect
Search our site for products, services, training and support
Viksit Bharat 2047 calls for a new rail delivery model—one that connects planning, design, construction, and operations through a single digital foundation. Bentley helps rail leaders reduce risk, accelerate delivery, and futureproof infrastructure at scale. Explore the strategy in our complimentary e-book and see how digital transformation is reshaping India’s rail future. Fill out the form to access it now.
India’s railway expansion is a historic undertaking. But delivering on the ambitious goals of the National Rail Plan means leaving behind the constraints of traditional, siloed workflows. Disconnected data, constant delays, and budget overruns are no longer acceptable.
To build the high-speed, fully electrified, and interconnected network of tomorrow, you need a digital-first approach. Bentley provides the unified platform to eliminate guesswork, align stakeholders, and ensure project certainty from concept through to operations.
“The technological innovations provided by Bentley helped DMRC to save approximately 1,200 [resource] hours along with huge material savings of 350 megatons of structural steel in this project.”
Delhi Metro enhanced urban connectivity by building a complex interchange station to connect two operational metro lines, improving passenger travel. Leveraging Bentley’s 3D modeling and digital twin technology, they simulated construction and optimized the design, saving INR 8 million and boosting team efficiency by 20%.
Stop managing your project in fragments. Bentley’s connected data environment gives you a single source of truth, from the first sketch to the final day of operation, ensuring you can:
Move beyond 2D plans and their inherent risks. Create a powerful, data-rich 3D digital blueprint of your entire project.

Model track, bridges, tunnels, and electrification systems in a unified 3D environment to resolve conflicts on screen, not on site.

Rapidly analyze multiple design scenarios to find the most efficient alignments, directly reducing material costs and timelines.

Generate realistic visualizations that clearly communicate your vision for faster buy-in.
Turn your digital design into a predictable construction schedule. Connect your office, teams, and job site to deliver on time and on budget.

Link your 3D model to the project timeline to create dynamic 4D construction sequences, optimize logistics, and identify risks before breaking ground.

Give crews real-time access to digital models, enhancing safety and eliminating costly rework.

Monitor progress against your plan in real time to manage resources effectively and make proactive decisions.
The long-term success of India’s railways depends on world-class reliability. Transform your operations with a living digital twin that monitors asset health in real-time.

Use AI to predict potential failures before they disrupt service, reducing downtime and lowering lifecycle costs.

Unify all engineering and operational data into one hub for faster, smarter decisions.

Analyze performance trends to make data-driven decisions on renewals and capital planning, extending infrastructure life and maximizing ROI.
Download a Free E-book
Ready to dive deeper? Our new e-book, Advancing Rail Through Infrastructure Intelligence, provides a step-by-step framework for implementing a digital strategy that minimizes risk and maximizes your return on investment.
Loading form...
From the Delhi Metro to the UK’s high-speed lines, rail authorities and their partners trust Bentley to deliver complex projects. Explore their stories:

Faced with tight schedules on India’s rising number of urban rail projects, Larsen & Toubro digitized their manual workflows using Bentley’s OpenRail. The impact was immediate: detailed drawing revision times were slashed from 15 days to just two days, and resource requirements were cut by 75%.

To design a new rail link through hilly, environmentally sensitive terrain, RITES Limited used Bentley’s integrated software to model the corridor and analyze the earthworks. This digital approach optimized the alignment and led to a massive INR 1.53 billion reduction in the original project cost while protecting the environment.

On a massive 447 kilometre rail project, SPL Powerlines unified over 20 design firms with Bentley’s digital platform. The result? A 50% improvement in data quality in just four weeks, dramatically reducing rework and delays.