4D construction planning software

BENEFITS

4D construction planning and scheduling

SYNCHRO 4D helps teams plan, schedule, and manage construction projects in a visual 4D environment.
SYNCHRO 4D interface showing critical path construction tasks highlighted in red on a 3D model
  • Improve project visibility with 4D

    Simulate construction sequences, evaluate what-if scenarios, and detect issues early with model-based 4D visualizations.

  • Reduce project risks and costs

    Identify issues early in a dynamic 4D environment, minimizing errors and rework in the field to improve cost and resource efficiency.

  • Improve stakeholder alignment

    Align teams with visual reports and simulations that make plans easy to understand, reduce misunderstandings, and support better decision‑making.

PRICING OPTIONS

Exclusive pricing options

SYNCHRO 4D

Construction software to plan and manage projects in a 4D environment

Starting at

$4,980.00 USD

12-month Virtuoso subscription

Includes 1 license and 2 Keys for training or services

  • Leverage 4D models to schedule tasks and optimize workflows
  • Visualize and simulate construction sequences and “what-if” scenarios
  • Monitor and analyze progress, cost, and schedule performance
  • Compare baseline vs. actual schedules
  • Drive stakeholder collaboration through dynamic, visual plans

More details

4D modeling & virtual planning

  • Break down design models into constructible components
  • Visualize and simulate construction sequences and “what‑if” scenarios
  • Monitor progress and analyze cost and schedule performance
  • Perform clash detection using integrated BIM data for proactive issue resolution  

Scheduling & workflow integration

  • Create schedules or integrate with tools like P6 and Asta Powerproject
  • Plan virtually with 4D models interoperable with 50+ CAD applications
  • Link schedules to 3D models to build dynamic 4D timelines
  • Automate progress tracking from field updates  

Collaboration & communication

  • Drive stakeholder coordination through dynamic, visual 4D plans
  • Share simulations that enhance communication and decision‑making
  • Align teams with clear, intuitive visualizations across disciplines
  • Integrate with cloud-based dashboards for performance tracking  

The following minimum, recommended, and Enterprise Edition system specifications are outlined below.

The minimum specification accommodates a project with several thousand tasks, and some 3D information (such as the example models provided with SYNCHRO Pro).

  • Processor: 2.8 GHz Quad Core
  • Memory (RAM): 16 GB
  • Graphics Card: 4 GB
  • Display: 1280x1024

The recommended specification accommodates a project with tens of thousands of tasks, and detailed 3D information.

  • Processor: 4 GHz Octa Core
  • Memory (RAM): 32 GB or greater
  • Graphics Card: 16 GB
  • Display: 2560x1600 and dual monitors

The enterprise edition specification ensures scalability and performance for the largest projects, and highly detailed 3D information (for example structure plus MEP detail).

  • Processor: 5 GHz Octa Core
  • Memory (RAM): 64 GB or greater
  • Graphics Card: 32 GB, 64 GB, or greater
  • Display: 2560x1600 and dual monitors  

Explore your subscription options and understand how access works before, during, and after purchase.

Learn more »

USER STORIES

Real stories. Real results.

EchoWater wastewater project delivered $400M under budget

The team used SYNCHRO to plan and manage 22 parallel projects, improving coordination and execution efficiency and contributing to a $400M cost underrun.

Aerial view of the large-scale EchoWater wastewater treatment plant during construction

SEPA Surrey Hills level Crossing removal cut emissions 30% and staged 71% faster

A 4D SYNCHRO model enabled the team to reduce embodied carbon by 30% and accelerate construction staging development by over 71% compared to 2D methods.

A 4D construction model in SYNCHRO showing the phased construction of a new rail station and trench

Sellafield Retreatment Plant (SRP) identified £80M in schedule benefits

SYNCHRO helped the project team uncover £80M in schedule-related improvements and identify over 160 risks, strengthening certainty and proactive decision‑making.

Wide aerial view of the sprawling and complex Sellafield nuclear industrial site

FAQS

Find answers

SYNCHRO 4D is used to create time‑based (4D) construction models that connect the project schedule with a 3D model for better planning, visualization, and coordination.

4D construction scheduling links project tasks to 3D model components so teams can visualize how a project will be built over time.

4D simulation helps stakeholders make better decisions by visually showing construction sequence, risks, conflicts, and potential delays before work happens on site.

Clash detection software identifies and reports conflicts or interferences between building components in a digital model before construction begins. SYNCHRO provides a dedicated 3D model clash workflow that helps teams quickly detect, manage, and resolve these issues within their BIM models.

Construction scheduling and planning software improves projects by increasing predictability, optimizing resources, reducing rework, and enhancing coordination across teams.

Yes, SYNCHRO 4D supports direct import of IFC models in versions 2x, 2x2, 2x3, and 4, and it can export IFC models in versions 2x, 2x2, and 2x3.