Mar 11, 2026 · 11:00AM
EMEA Going Digital Webinar for Transmission and Distribution: BAM Infra Netherlands
Thank you for your interest in our Going Digital Awards webinar series!
During our Going Digital Awards webinar series, we are showcasing award winners, finalists, and nominees and their outstanding projects that are making the world a safer, more sustainable place. This series is an extension of our Year in Infrastructure conference and Going Digital Awards program, where we celebrate the most extraordinary infrastructure projects and the people behind them. Over the course of this series, we'll showcase some of the best projects that came out from Europe, the Middle East, and Africa.
Join us as BAM Infra Netherlands shares its work at the Mainstation Schiphol Amsterdam airport.
The new high-voltage station Schiphol-Centrum aims to create a central energy hub for Schiphol Airport, adding more grid capacity for the airport terminals and facilities while contributing to the airport's carbon neutrality goals. BAM is responsible for civil and electrical construction works and faced space constraints, limiting on-site logistics and creating safety concerns. To address these challenges, they sought to prioritise 4D buildability, logistics, and safety, and needed advanced construction simulation technology.
In this webinar, you will discover how BAM selected Bentley SYNCHRO to: Link the project model to the construction schedule, creating an integrated 4D visual, phased construction plan. Optimise logistics and temporary setups, reducing transport movement by 25%, improving safety, and saving emissions and costs. Identify and avoid 85 planning and safety risks, resulting in zero safety incidents and a total savings of EUR 525,000. Reduce overall construction time by four months to complete the project more safely, sustainably, and cost-effectively. Register today for your chance to hear it straight from the experts!
