Home / Resources

Resources

Resource Center

Learn more about Bentley software and services

Resource Search

Software Category

Software Category
  • Digital Twins (73)
  • Utility and Communication Networks (66)
  • Project Delivery (60)
  • Roads and Site Design (57)
  • Hydraulics and Hydrology (53)
  • Construction Management (49)

Resource type

Resource type
  • User Story (294)
  • Data Sheet (115)
  • E-Book (101)
  • Infographic (31)
  • Article (28)
  • Solution Sheet (20)

Featured Software

Featured Software
  • iTwin (93)
  • ProjectWise (91)
  • MicroStation (84)
  • SYNCHRO (76)
  • OpenFlows (47)
  • PLAXIS (35)
User Story
Roads and Site Design

JKR Sarawak provides first continuous land connection between East Malaysian states

Bentley’s digital twin platform cuts project costs by 30% while minimizing environmental impact on protected areas by 80%

Data Sheet
Reality and Spatial Modeling

iTwin® Capture Modeler Flex

Add real-world insights to your digital twins with reality modeling.

Data Sheet
Bridge Design

OpenBridge® Designer

Integrated Modeling, Analysis, and Design for Bridges.

User Story
Construction Management

Vale and Deloitte build a greener future for iron ore mining

SYNCHRO™ helped transform an ambitious project into a model of efficiency, safety, and environmental responsibility.

User Story
Construction Management

Mortenson and McCarthy deliver landmark luxury resort

Leveraging SYNCHRO™ or advanced 4D construction planning saved six weeks, completing the West Coast’s largest hotel project.

Comparison Chart
Mobility Simulation

OpenPaths

OpenPaths delivers the most comprehensive transport modeling platform for strategic and operational transport planning.

User Story
Building Design

New Transport System Sparks Smart Urban Planning in West Dongba

OpenPaths CUBE Helped Create a Transportation Prediction Model, Expected to Improve Travel Efficiency by 15% and Reduce Vehicle Carbon Emissions by 21,000 Tons.

User Story
Bridge Design

Smart Prefab

OpenBridge reduces model calibration time by over 90% and engineering costs by 70%.

E-Book
Roads and Site Design

Can Your Travel Demand Modeling Software Keep up with Changing Travel Patterns?

Transport agencies around the world rely on travel demand models to evaluate mobility infrastructure, policy, and multimodal transport systems.

User Story
Roads and Site Design

City of Edmonton Develops Citywide Traffic Simulation and Modeling for Fast-growing City

Using OpenPaths™ DYNAMEQ®, City Planners Developed a Roadmap to Model Edmonton’s Roadways for Smarter Future Planning.

User Story
Rail Design

CitiME Develops Travel Demand Model to Improve Public Transport in Greater Cairo Region

OpenPaths® CUBE Provides Predictive Multimodal Transportation Modeling and Simulation, Supporting Sustainable Urban Mobility.

User Story
Rail Design

Transport for London Delivers the Elizabeth Line, London’s Largest Addition to Public Transport in over 50 Years

OpenPaths EMME helped improve commuter experience, bringing an additional 1.5 million people within 45 minutes of Central London.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"