• Liaoning Water Conservancy and Hydropower Survey and Design Research Institute Co., Ltd.

    Application of BIM Technology in the Dongtaizi Reservoir Project

    Chifeng, Inner Mongolia, China

Project Summary

    • LAND AND SITE DEVELOPMENT - Liaoning Water Conservancy and Hydropower Survey and Design Research Institute Co., Ltd.

Alleviating Severe Flood Risk, Supplying Natural Resources

Liaoning Water Conservancy and Hydropower Survey and Design Research Institute was responsible for delivering the engineering design of the Dongtaizi Reservoir. This project is one of 172 major water conservancy endeavors meant to tackle China’s water scarcity and flood risk issues sponsored by the Chinese government. The proposed infrastructure is a rockfill dam with an asphalt core wall and a concrete gravity dam with a total storage capacity of 321 million cubic meters. Located in the upper and middle reaches of the Xar Moron River in Chifeng, Inner Mongolia, the reservoir will mitigate severe flood risk in the lower reaches of the river and supply water and agricultural irrigation to the areas adjacent to bottom of the river basin.

Challenging Boundary and Structural Conditions

The surveying tasks and engineering specifications on the Dongtaizi Reservoir Project were immense. The site’s complex terrain required an accurate geological survey of the rock mass foundation types and structural plane upon which the dam design would be based. A curved ecological fishway that enables migrating fish to pass through the dam demanded significant excavation that necessitated more than traditional 2D processes. Designing the rockfill dam section involved many control conditions and complicated interactions with the landscape, which cannot be solved with conventional 3D modeling. Additionally, multidiscipline engineering and visualization capabilities were essential to design the metal structure, hydraulic machinery and engineering, and an electromechanical system. Therefore, Liaoning Water realized that they had to adopt building information modeling (BIM) solutions to overcome traditional design limitations on this large-scale water conservancy project.

BIM Applications Overcome Traditional Design Restrictions

After considering their options, the team employed Bentley’s BIM software for accurate 3D design. Liaoning Water integrated OpenBuildings and OpenRoads Designer to streamline collaboration among multiple engineering disciplines and to manage data. They surveyed the landscape and created a detailed 3D geological model to precisely calculate excavation volumes and plan excavation processes. This visualization in OpenRoads also allowed the project team to accurately position the ecological fishway and connect the structure’s complicated spatial curve to the landscape. The rockfill dam section was designed using OpenRoads’ linear engineering capabilities to generate a truthful 3D model incorporating all control and boundary conditions. Several engineering disciplines collaborated on the design of the concrete dam in OpenBuildings, allowing the hydraulic machinery, metal structure, and electromechanical equipment to be designed to avoid collisions.

Leveraging BIM Technology to Deliver a Digital Twin

By using Bentley applications, Liaoning Water reduced design error by 90%. Delivering a technologically advanced model minimized changes to the overall design during construction. Accurately calculating project cost in the design stage of the project decreased the government’s overall investment. With the support of open modeling technology, the project team improved design efficiency by 40% to deliver the plans two weeks ahead of schedule. They leveraged BIM software to produce a digital twin that provides full lifecycle support of the dam, including management during construction, operations, and maintenance. Using this project as the foundation for BIM usage on future water conservancy projects, Liaoning Water has implemented corporate 3D collaborative design standards and trained personnel to become a regional leader in BIM application.

Project Playbook: OpenBuildings Designer, OpenRoads Designer

Outcome/Facts
  • The Dongtaizi Reservoir Project is one of 172 major water conservancy projects in China and one of 12 key livelihood projects in Inner Mongolia meant to mitigate severe flood risk and combat water scarcity.
  • Complex terrain and infrastructure design required 3D modeling solutions to quantify structural elements and excavation amounts.
  • Using BIM applications reduced design error by 90%, avoiding design changes and rework during construction.
Quote:
  • “The use of Bentley software has solved the important and difficult problems in the engineering design of Dongtaizi Reservoir, provided strong endorsement for designers, improved the design efficiency of our institute, reduced design errors, and made the digital transfer of design results possible.”

    Wang Yixin Director of the Digital and Smart Engineering R&D Center Liaoning Water Conservancy and Hydropower Survey and Design Research Institute Co., Ltd.