• User Projects

    Outstanding projects from our users

These outstanding user projects from our annual Year in Infrastructure Awards competition highlight our user’s extraordinary work, sharing innovative practices in infrastructure project design, engineering, construction, and operations.
Selected Filters Show Filters

Filter By

  • By Product Line


















  • By Solution



















































  • By Capability











  • By Brand















































  • By Year














  • By Year in Infrastructure Awards Category


























  • By Country




























































  • Design and Build of Harbour Road 2
    PT. Wijaya Karya transitioned from 2D modeling to BIM methodology to design a USD 530 million toll road that includes the longest double-decker bridge in the world.
    PT. WIJAYA KARYA (Persero) Tbk
  • High Speed/High Capacity in Southern Italy: Napoli-Bari Route
    Italferr, the engineering company of Ferrovie dello Stato Italiane Group, uses Bentley’s open applications to drive efficient digital workflows, optimizing design, construction management, and sustainability along an important railway in southern Italy.
    Italferr S.p.A.
  • Application of BIM Design on the Expansion of JiHe Expressway
    CCCC developed 3D models of a 43-kilometer stretch of the JiHe Expressway to reduce survey time by 42 days.
    CCCC First Highway Consultants Company Limited
  • Thames Tideway East
    Costain, VINCI Construction Grands Projets and Bachy Soletanche Joint Venture saves more than GBP 1 million by implementing 4D collaborative digital workflows on the Thames Tideway East Tunnel.
    CVB JV
  • The New Polcevera Viaduct
    Italferr automated design methods and determined critical moments in construction within Bentley’s design engineering applications to speed replacement of a collapsed bridge.
    Italferr S.p.A.
  • NE 203rd St. Intersection Improvements
    AECOM used Bentley applications to redesign a busy highway and railroad crossing, increasing design quality and improving collaboration to save 1,040 resource hours.
    AECOM