FEATURED PROJECTS
Discover What Users Are Achieving with SYNCHRO

PROJECT PROFILE
Clark Construction Group, LLC – SeaTac Airport International Arrivals Facility
Clark Construction used SYNCHRO 4D for construction simulation and animation to successfully plan and install the world’s longest elevated pedestrian bridge over a busy airport taxi lane, without impact to airport operations

PROJECT PROFILE
CVB JV (Costain, VINCI, and Bachy Soletanche Joint Venture) – Thames Tideway East
Using 4D construction models in weekly collaborative planning meetings, CVB JV facilitated development and scheduling of complex construction activities in advance, saving significant project time

Project Profile
Clough – Port Moresby Power Station
SYNCHRO Perform allowed Clough to establish a unified, digital workflow that helped them quickly detect and resolve potential issues

Project Profile
Fulton Hogan Seymour Whyte Joint Venture – Bruce Highway Upgrade
SYNCHRO Perform enabled accurate progress and performance measurements that allowed them to track and redeploy resources to meet project needs and provide efficient, error-free time capture

PROJECT PROFILE
MPC Kinetic – Queensland Natural Gas Project
By using SYNCHRO Perform, the team improved day-to-day execution in terms of data and records management, transforming how they internally operated and successfully delivering the project

PROJECT PROFILE
ASGC – Coca-Cola Arena Project
SYNCHRO improved the team’s time management on the steel structure’s construction and delivery, saving about two weeks and corresponding costs

Case Study
SAMI Provides Digital Foundation for Smart Factories in China’s Aluminum Industry
Using SYNCHRO 4D for virtual construction scheduling reduced the construction period by 6% and is expected to save 72 construction days and more than CNY 57 million

Case Study
Lane Construction Constructs Storage Reservoir for Everglades Restoration
Lane Construction used SYNCHRO Field and SYNCHRO Control to split design models for quantity take-off, estimating, and scheduling project work activities and scope

Video
Zachry Group - Golden Pass LNG Export Project
The team leveraged SYNCHRO 4D to plan work activities in an optimized manner that reduces area congestion, conduct work tasks reviews that enable crews to identify and mitigate risks before stepping foot on a job site.

Video
Lane Construction Talks About the Value of SYNCHRO
SYNCHRO’s three differentiators for Lane Construction is its construction modeling ability, the seamless design-build workflows and how it’s built specifically for the heavy civil construction industry

Video
One Za’abeel – ALEC Engineering and Contracting LLC
ALEC leveraged SYNCHRO to virtually plan their project, increase productivity by 20% and meet the tight time-constraints of the project

Video
Crossrail CRL Showreel
Video produced by the Crossrail Project in London summarizing their implementation of SYNCHRO 4D on several train station upgrade projects