We use cookies to provide you with the best possible user experience. If you continue to use the site without changing your cookie settings, we assume you are fine with our cookies and the way we use them. The cookies store information about how you use our website, and help you use some of the functions on the site. Our cookies do not store any sensitive information, and we never use your cookies for targeted advertising. If you want, you can change your computer’s settings so that it does not accept cookies. We have information here on how you can do that.
Find solutions by project type.
Ausenco uses Promis.e to develop an integrated approach that automates processes and significantly reduces engineering hours across all global projects.
Vale reduces engineering costs by CAD 400,000 using Bentley’s 3D modeling software to redesign and rebuild an ore loading station 4,160 feet underground.
Ausenco seamlessly brings together disparate teams from across three countries to create a process for future project management and engineering projects.
AMEC joint venture delivers AUD 247 million ore-handling project in 19 months using Bentley’s integrated, intelligent 3D modeling environment.
Agrium improves reliability by 50 percent and reduces maintenance costs by 32 percent at its Vanscoy Potash Operations using Bentley’s AssetWise APM solution.
Petra Diamonds replaced legacy systems with Bentley software-based GIS that served a dual purpose: mine data management and town utility billing.
Hatch uses MineCycle Material Handling to optioneer a lump rescreening plant for an existing iron export terminal in Whyalla, Australia, improving design efficiency by 33 percent.
AMEC Foster Wheeler used Bentley applications to create data-rich 3D models for the largest undeveloped gold deposit in Australia.
Leslie McHattie, Reliability Practitioner
Victor Alvarez
John Sanins, Director, Solution Management
Dave Body, Solution Executive, Mining