Mott MacDonald

is Going Digital with Bentley


Mott MacDonald, along with Costain, VINCI Construction Grands Projets, Bachy Soletanche Joint Venture, accelerated project delivery on East Tideway Tunnel Project, improved collaboration, created a connected data environment, and helped the city in their efforts to clean up the Thames.

What was the outcome?

  • Saved 22.5 hours per week on design production reducing it from 5 days to 1
  • Reduced design delivery time by 6 months with model-based delivery
  • Saved 32% in design production time savings through Bentley’s BIM advancements
  • Accepted 76% of packages the first time due to improved collaboration and program assurance
  • Saved 80% on information delivery time

What products were used?


ProjectWise
OpenBuildings Designer
STAAD
LumenRT
ContextCapture

image image image

Improve project delivery workflows with instant-on BIM Collaboration


Learn more
image image image
Michael Gaunt Michael Gaunt Michael Gaunt

“The project common data environment, hosted on ProjectWise, allows us to easily access the latest information and has improved and simplified design approvals. ProjectWise provided the tool to coordinate over 80,000 documents totaling 685 gigabytes of data to give 300 users across 12 design disciplines the latest controlled information on which to base design and construction decisions.”


Michael Gaunt

BIM Manager, Mott MacDonald