Foth Going Digital
With Bentley
Road Corridor Revitalization Project: A USD 38.9 million roadway revitalization project in Cedar Falls, Iowa to improve traffic flow and safety, provide bicycle and pedestrian access and mobility, and facilitate commercial access while minimizing capital investment and operational costs.
What's the Outcome?
- Bentley’s open applications facilitated coordinated modeling to reduce conflicts and expedite design by an estimated 50%, saving over USD 500,000 in construction costs Read the full case study
- The BIM model optimized data accessibility and increased the efficiency of Foth’s interactions with the public and stakeholders by 50%.
- The solution delivered an innovative, multimodal roadway design configuration, projected to realize USD 32 million in ROI for the owner over the next 25 years.

“Using Bentley products has greatly helped Foth in Going Digital.”
What products were used?


