Toyo Engineering Delivers its Largest Ethylene Plant

Fast Facts

  • Toyo implemented integrated engineering and analysis processes to deliver its largest ethylene plant project located in Malaysia.
  • Bentley software’s seamless integration optimized engineering and design of RCC structures, ensuring process standardization and uniformity of deliverables.
  • Toyo applied advanced engineering design codes using Bentley technology to comply with new European standard codes consistent with local design regulations.

ROI

  • Bentley’s technology enabled the team to complete the project within 18 months.
  • Performing iterative and complex design checks and synchronizing drawings saved 30 percent in engineering
    hours.
  • The integrated workflow facilitated design optioneering and enabled parallel work on site to save 10 percent in construction time.
Project Summary
Organization
Toyo Engineering
Solution
Manufacturing
Location
Malaysia
Project Objectives
● Deliver a large-scale, steam cracker complex in Malaysia.
● Complete conceptual and detail design within an 18-month timeframe.
● Design concrete plant structures in compliance with European codes with Malaysian annexures.
Products Used
STAAD.Pro®, STAAD® Advanced Concrete Design