AECOM Going Digital

With Bentley

Intersection and Improvements Project: A USD 35 million highway and railway intersection redevelopment project in Florida to remove an at-grade railroad crossing and construct a new 355-foot-long pedestrian bridge, widen an existing bridge, and add two new ramp bridges.

WHAT WAS THE OUTCOME?

  • AECOM developed an integrated 3D model of all proposed roadways and ramps to visualize all aspect of the design and improve decision-making.  Read the full case study  

  • ProjectWise allowed AECOM to significantly increase efficiency through effective collaboration among a multidiscipline project team distributed across the state.

  • The multidiscipline solution enabled AECOM to meet the project requirements to minimize the impact on environmentally sensitive areas, the railroad corridor, and the adjacent neighborhood.
Kevin Cornish

“Going digitial for AECOM is about leveraging the tools we use to their maximum capability.”

KEVIN CORNISH, PE

AECOM SVP Design Consulting Services,
Surface Transportation

WHAT PRODUCTS WERE USED?

Stub_PBA_Airport-Link_Section-1_Image-K_-Airport-Roundabout-Upgrade---01

OpenRoads

Civil Design Software for Road Networks

stub_iStock_000045880626_XXXLarge

OpenBridge

Design, Modeling, and Analysis Software for Bridges

Stub_City_gradient

ContextCapture

Reality Modeling Software

stub_000038646638

ProjectWise

Project Delivery and Collaboration Software

Other Products Used: MicroStation, LumenRT, iModelHub, SYNCHRO

MULTIDISCIPLINE DESIGN AND ENGINEERING SOLUTIONS


Arrow

Learn More about Bentley’s Solutions for Roads and Bridges

image image image