• China Water Resource Pearl River Planning Surveying & Designing Co., Ltd.

    Wugachong Reservoir Project in Pu’an County of Guizhou Province

    Pu’an County, Qianxinan Buyei and Miao Autonomous Prefecture, Guizhou Province, China

Project Summary

Project
The CNY 873 million Wugachong Reservoir project was one of several water resource projects launched in southwestern China to alleviate the worst drought in a century, which began in 2010. This drought affected 50 million people, leaving 20 million people without potable water and 5 million hectares of crops without irrigation. Tasked to supply water, irrigation, and power to Guizhou province, China Water Resource Pearl River Planning Surveying & Designing Co., Ltd. (PRPSDC) needed to construct an arch dam, spillway, power plant, pumping station, and other facilities to meet these goals. The narrow construction site presented complex topographic and geological challenges including a fault on the right abutment and a fissure on the upstream left bank.

Solution
Using BIM applications based on MicroStation, PRPSDC resolved the problems of irregular excavation and construction layout. Bentley's 3D analysis and design technology optimized the reservoir design scheme, enabling seamless project delivery. Parametric assembly of secondary projects saved time by avoiding repetitive design tasks. PRPSDC delivered the initial 3D model in two months using Bentley's 3D BIM platform.

Outcome
PRPSDC ensured that all project participants had a better understanding of the project design by using hypermodeling technology to connect drawings, reports, and standards to the 3D model. Bentley's BIM platform provided standards for 3D collaborative design that replaced traditional methods and improved efficiency and quality. Using ProjectWise, MicroStation, and the set of design applications, the team performed 30 percent more efficiently while decreasing the defect rate by 85 percent.

Software
Bentley software improved design quality with highly accurate, automated excavation quantity estimation (GEOPAK), road and bridge modeling (PowerCivil), hydraulic machinery layout (OpenPlant), and substation design (Substation and Bentley Raceway and Cable Management). ProjectWise promoted collaboration among multiple disciplines. AECOsim Building Designer assembled the 3D models and Bentley Navigator detected collisions. GenerativeComponents allowed fast and efficient work with quickly changing parameters.

Project Playbook: AECOsim Building Designer, LumenRT, Bentley Raceway and Cable Management, Bentley Substation, Bentley Map, MicroStation, Navigator, OpenPlant, OpenRoads, ProjectWise
Outcome/Facts
  • Von der Dürre in China im Jahr 2010 waren 50 Millionen Menschen betroffen. Das Wugachong Reservoir Project war ein Wasserressourcen-Projekt zur Linderung der Folgen dieser verheerenden Dürre.
  • Das Wugachong Reservoir Projekt der Wugachong Water Conservancy and Hydropower Co., Ltd. hat das Problem der lokalen Wasserversorgung und Bewässerung gelöst und stellt gleichzeitig eine erneuerbare Energiequelle bereit.
  • PRPSDC erstellte mit LumenRT 3D Videos, um dem Eigentümer den Projektplan zu erklären und die BIM-Fähigkeiten des Unternehmens für andere Projekte herauszustellen.
Quote:
  • „Bentley stellt alle Planungsspezialitäten mit Plattformen für die Kollaboration, vereinheitlichte Standards und ein einheitliches Dateiformat bereit. Jedes Spezialgebiet wird die Planungseffizienz mit den leistungsstarken Softwarefunktionen, der Möglichkeit zur Customization, den Fähigkeiten zur Kollisionserkennung und anderen Funktionen erheblich verbessern.“

    Zhihao Fu Direktor des BIM Technology Application Center Wugachong Water Conservancy and Hydropower Co., Ltd.