Back to the Bentley power generation solution

 

Wink Incorporated Turns to Bentley AutoPLANT to Design World's Largest District Heating and Cooling System
Bentley AutoPLANT proved to be the most precise, reliable and cost-effective design tool on a fixed bid, 32,000-ton cooling plant project for the New Orleans Medical Complex that left no margin for error. Wink, Incorporated was hired to provide overall project design and coordination for the construction of a 32,000-ton cooling plant – with thermal energy storage – known as District Energy for NOrMC.

2007 Be Award Finalist: York Internation a Johnson Controls Company
Renewable Energy Corp, Moses Lake Expansion. The $7 million Moses Lake Expansion project will double Renewable Energy Corp.’s capacity to produce polysilicon at its Washington state facility.

2007 Be Award Winner: North China Power Engineering (Beijing)
Building Up NCPE Content Management Platform With ProjectWise as the Core. North China Power Engineering (NCPE) needed a well-managed design, information exchange, and publication process that would be traceable and satisfy quality-control requirements.

Monsanto
3D modeling improves teamwork in demanding powerhouse renovation. When a Midwestern college took a look at its need for a system of four new boilers in a 100-year-old facility, it was more than an issue of just getting more efficient steam production.

Tapping New Resources
Offshore oil engineers use Bentley solutions to collaborate from offices on two continents. Just 42 miles off Scotland's Atlantic coast, the rich Clair oil field seemed tantalizing but out of reach since its discovery in 1977. The reservoir's complex geography frustrated attempts at a cost-effective plan for tapping the largest untouched field on the U.K. continental shelf.

水电站大坝利用可再生能源助力经济持续发展
水电站大坝利用可再生能源助力经济持续发展建设水电站是满足中国能源持续增长需求的战略性组成部分白鹤滩大坝高 277 米,预计将于 2020 年竣工,届时它将成为中国坝体最高、世界上排名第四的水电站大坝。