|
|
|
Bentley users are doing extraordinary work improving and sustaining the world’s infrastructure. These projects set benchmarks and showcase the imagination and technical mastery of the organizations that created them. Read and discover how these Bentley users accomplished success with some of the most innovative projects in the world.
 |
 |
HDR Engineering: Hoover Dam Bypass
Led by HDR Engineering, the Hoover Support Team applied MicroStation and GEOPAK Civil Engineering Suite software to complete the design of this 3.5 mile bypass and 1,900-foot bridge
The Hoover Dam Bypass helps ensure personal safety, smooth-flowing commerce and homeland security for one of the nation’s national treasures. Led by HDR Engineering, the
>> 更多 |
 |
 |
2007 BE Award Finalist: RITES Ltd
Design of New Jubilee Bridge
Originally constructed in 1887, the Jubilee Bridge provides an important railway link across the river Hooghly. Although it is still operational, the bridge has severe
>> 更多 |
 |
 |
2007 BE Award Winner: Arup
Marina Bayfront Pedestrian Bridge
The Marina Bayfront Pedestrian Bridge in Singapore is the first of its type in the world. At 280 meters long, the bridge features a unique double-helix
>> 更多 |
 |
 |
Poland's Province Integrated Information System (DSIP)
Polish regional authority (DSIP) integrates spatial information for efficiency
Lower Silesia, one of 16 administrative units in Poland, is the seat of local government for the region, performing both legislative and information management functions for
>> 更多 |
 |
 |
Danish Road Directorate: Land Acquisition GIS
LARGIS, built on MicroStation GeoGraphics, helps the Danish Road Directorate better understand the impact of specific routes when a new road is planned
When a new road is planned, the route may take it through property not owned by the government. The Danish Road Directorate’s GIS team in
>> 更多 |
 |
 |
Bentley Solutions: The Corporate Standard at Oldham Metropolitan Borough Council
Bentley’s products—from creation tools to back office data management, integration to publishing solutions— aid the Borough in meeting its e-Government strategy of an integrated property data model
Having grown from three MicroStation licenses purchased in 1993, Bentley technology is now the Council’s corporate standard. MicroStation, MicroStation GeoGraphics, and Bentley GeoOutlook are being
>> 更多 |
 |
 |
Oldham Metropolitan Borough Council: Waste Landfill Monitoring System
The new system can use aerial photographs as backdrop maps, and borehole details and reports are automatically generated from the database
Oldham Metropolitan Borough Council (OMBC) is the lead authority for the development of recycling, waste disposal and landfill sites in the Greater Manchester area. This
>> 更多 |
 |
 |
2005 BE Award Winner: The City of Calgary
Better Base Maps Facilitate Citywide Data Sharing
Better base mapping management is helping the City of Calgary, Canada share data citywide. Workflow efficiencies have resulted from improvements in data entry, data accuracy, and data
>> 更多 |
 |
 |
City of Helsinki converts to 3D mapping
City of Helsinki converts to 3D mapping
The City of Helsinki, Finland, is currently involved in a conversion and upgrade project to supplement its digital 2D basemaps with a new, accurate 3D
>> 更多 |
 |
 |
AEC and GIS Interoperability in Practice
The City of Gentofte implements an interoperable solution comprised of Bentley's engineering applications and ESRI's planning and analysis applications
The City of Gentofte is the seventh largest municipality in Denmark, one of the 18 municipalities in Copenhagen. The municipality is responsible for public schools, child
>> 更多 |
 |
 |
Geospatial Technology Helps Borough Assess its Past
Geospatial technology helps borough assess its past to determine its future
During the Industrial Revolution, Oldham, located in northwest England, was the center for a thriving cotton industry. This brought with it prosperity, but also left
>> 更多 |
 |
 |
Toronto's future as a mapping leader becomes reality
Rebuilt 3D topographic map base saves city $7 million to date, supports city services, provides data to outside users
When the present-day City of Toronto was consolidated from seven municipalities in 1998, a number of challenges were created, most notably rebuilding the topographic map base,
>> 更多 |
 |
 |
3D Landslide GIS Protects Citizens and the Environment
The system lets engineers better manage, evaluate, and present to clients and the public projects designed to prevent landslides
In the field of mountain hazard prevention, one cannot overstate the role of geographic information systems (GIS). These systems have been used to present information
>> 更多 |
 |
 |
长滩港
Bentley CAD 和 GIS 平台标准
助力简化基础设施工程实施流程
Bentley CAD 和 GIS 平台标准
助力简化基础设施工程实施流程
加利福尼亚长滩港每年运输价值超过一千四百亿美元的货物,已成为美国第二大港口;与此同时,其庞大的货物流量为美国提供了超乎想象的一百四十万个就业机会。仅在 2007 年,该港口就处理了 7,312,465 个集装箱(占美国总量的13%),囊括了从服装、玩具到家具、家电的各个行业。各专业码头还运输石油、汽车、木材及其他产品。长滩港座落在洛杉矶以南 25 公里处,为通过西海岸的大约 1/3 水运贸易提供码头 – 这一容量正在以 8.5% 的年增长率递增。
长滩港就像是一座小城市,占地 13 平方公里(3,200 英亩)。它拥有 7 个独立的集装箱码头、10 个凸式码头、80 个泊位和 72 台巴拿马龙门吊
>> 更多 |
 |
 |
浙江省测绘局Bentley 产品应用介绍
浙江省测绘局Bentley 产品应用介绍GIS技术开发应用在中国处于领先水平
Bentley 产品的应用,提高了工作效率,节约了生产成本浙江测绘局省位于中国东南沿海长江三角洲南部,截止2007年,该省完成了覆盖全省陆域 101,800 平方公里面积的数字线划图。其中包括1:250000数据17幅,1:50000数据330幅,1:10000数据4107幅,1:5000数据226幅。这些成果广泛应用于土地开发、水资源保护、交通运输、通讯及其他领域的政府部门。以前浙江省测绘局要完成工作,需要由一个250 人组成的项目团队用约五年时间进行数据的采集、处理和质检。Bentley 产品的应用,不仅提高了工作效率,更节约了项目成本。使得数字线划图生产过程缩短了一半,工时消耗减少将近三分之二。过去,完成全省 1:10000 的数字线划图生产需要大约 200 名制图员和 30 名质检员。而现在只需 80 名制图员和 20 名质检员,成本也降低了一半多。 “Bentley 软件的强大功能和高效率,在测绘领域的应用大大提高了数字地图产品的生产能力,更好地解决了各方面对GIS数据的需求”,浙江省地理信息中心主任陈少勤如是说。
利用Bentley 产品生产的成果符合国家标准,可供不同政府部门使用制定基础地理信息的技术标准,是国家测绘局的一项主要职责。所有数字线划图的绘制都必须遵循中国的国家基本比例尺地形图标准。数字线划图不仅要编译图形信息,还要采集足够的属性信息,以满足 GIS 应用将来可能出现的需要,各类要素分类编码必须符合国家标准。 按照国家局标准和浙江省实际情况,浙江省测绘局在 MicroStation 中定制了文档工作区,其中包括合适的种子文档、资源文件、字体库、颜色表和数据字典。同时利用标签管理的 MDL
>> 更多 |
 |
 |
2007 BE Award Finalist: City of Alpena
GIS at Every Desktop Realized Through MLS
The engineering department of Alpena, Michigan, had a staff of five who designed with MicroStation and another 73 staff and two subcontractors who needed access
>> 更多 |
 |
 |
Dutch Ministry
The goal of Dutch Ministry of Finance’s project was to create an integrated GIS-SAP solution that would provide administrative and geospatial data in one user
>> 更多 |
 |
 |
2007 BE Award Finalist: ADAC eV
TourSet Production
With nearly 16 million members, Munich, Germany-based ADAC e.V. is Europe’s largest automobile club. The club produces a comprehensive travel guide called the ADAC TourSet
>> 更多 |
 |
 |
Blom_Aerofilms
MicroStation at the Heart of LiDAR Surveying Solutions
Blom Aerofilms is the United Kingdom's leading provider of aerial photography and digital map solutions for civil engineering design, environmental assessment and land information management.
>> 更多 |
 |
 |
2007 BE Award Finalist: Mairie de Paris
Standardized Urban Road Design Application for City of Paris
While upgrading to MicroStation V8, the design department for urban roads in the city of Paris—which includes 75 designers distributed over 10 sites—decided to make
>> 更多 |
 |
 |
2007 BE Award Winner: AAMHATCH
True Orthophotography and 3D Model of the City of Melbourne
To support planning for the 2006 Commonwealth Games, AAMHatch created a true orthophoto, which provides a perfect plan view, where everything is straight up and down,
>> 更多 |
 |
 |
Gemeente Amsterdam, Dienst Ruimtelijke Ordening - IJburg
2007 BE Award Winner: Gemeente Amsterdam, Dienst Ruimtelijke Ordening – IJburg
The Amsterdam IJburg Project is an integrated sustainable urban development project that will provide housing, work, community, and leisure facilities on recently reclaimed land. It
>> 更多 |
 |
 |
2007 BE Award Finalist: Suzhou Unimap Software Co
Construction of China-Singapore Suzhou Industrial Parks Fundamental Geographical Information System
Suzhou Industrial Park is a major joint venture project between China and Singapore. Located in east of Suzhou and encompassing 288 square kilometers, Suzhou Unimap
>> 更多 |
 |
 |
Elisa Networks: Central Office Premises and Rack Management System
The document and premises management system handles information about 310 central offices and 9,500 racks
Elisa Networks’ business and asset information systems, such as the customer, agreement and equipment space databases had no interfaces between them, making space management difficult.
>> 更多 |
 |
 |
Guadalupe Valley Telecommunications Cooperative
Guadalupe Valley Telecommunications Cooperative takes advantage of Bentley communication solutions to streamline engineering processes
Guadalupe Valley Telecommunications Cooperative (GVTC) provides telephone, broadband, security, and cable television to more than 41,000 customers located in 11 counties throughout south central Texas.
>> 更多 |
 |
 |
Precision Contracting Services Deploys Bentley’s Communications Products
Innovative Network Design and Management Solution Increases Return on Investment for PCS Customers by More Than 25%
Precision Contracting Services Deploys Bentley’s Communications Products
As a result of productivity increases and rework reductions for its clients, PCS has increased the number of internal
>> 更多 |
 |
 |
Blue Ridge Communications uses advanced network modeling and design
Blue Ridge Communications uses advanced network modeling and design to better serve its customers
After evaluating potential solutions, Blue Ridge opted to implement Bentley’s communications software.
These products include Bentley Fiber, Bentley Coax, and Bentley Inside Plant. According to
>> 更多 |
 |
 |
VW Netwerk Bouw: CORBULO Project
The seamless support of the total engineering process generates a high level of efficiency and increased quality of VW Netwerk Bouw as a service provider
VW Netwerk Bouw is a service provider for companies with fixed fiber networks. The company needed to provide the engineers with an integrated solution to
>> 更多 |
 |
 |
2005 BE Award Winner: KeySpan
Communications - Fiber Network
When KeySpan broadened the scope of its fiber network through the creation of its unregulated subsidiary, KeySpan Communications, it was apparent that existing network files
>> 更多 |
 |
 |
2007 BE Award Finalist: Sierre Energie SA
Vario Fibre Optique Network
Sierre-Energie owns and manages a hybrid fiber coaxial network in the region of Sierre, Switzerland. The only way for Sierre-Energie to position itself for the
>> 更多 |
 |
 |
hellas_online
Attica Telecom is a go-ahead Greek telecommunications service provider founded by a group of large Greek construction companies in 2001. In April 2007, Attica Telecom
>> 更多 |
 |
 |
Nacap_Telecom
Nacap Telecom, a Dutch company specializing in the rollout of broadband services, designed and installed a broadband network in the zuid-Limburg region of the Netherlands in about a
>> 更多 |
 |
 |
COWI
COWI A/S uses Bentley communication solutions to design, document, and implement an FTTP network for Viborg, Denmark
Energi Viborg, the primary utility company in the county of Viborg, Denmark, planned to expand their public service offerings by adding a fiber-based broadband network
>> 更多 |
 |
 |
2007 BE Award Winner: Nacap Telecom BV
Fiber Optics Zuid-Limburg—Isilinx
This project includes a large area in the most southern part of the Netherlands called Zuid-Limburg. The backbone main fiber-optic ring connects the largest cities
>> 更多 |
 |
 |
SME: Electric Utility Network Operation and Maintenance System
SME's turnkey network information system -- based on Bentley's solutions for creating, managing, and publishing engineering content -- allowed the utility to reduce its workforce by seven percent
As part of the Czech Republic’s application to enter the European Union, the utility market is being privatized and deregulated. In order to be competitive,
>> 更多 |
 |
 |
Powering Australia's Growth
A managed environment built on Bentley solutions gives an energy company fast, wide access to vital data
ENERGEX, a leading Australian energy company, has upgraded its existing drafting and document management system to an integrated engineering design and content management system.
ENERGEX’s Transmission
>> 更多 |
 |
 |
Total
Total E&P Nederland B.V. gains faster access to geologic data, improving oil exploration and production decisions
When geoscientists need to make a decision, time is often at a premium. An oil company may be facing a tight deadlineon a competitive bid
>> 更多 |
 |
 |
Baltimore Gas and Electric Case Study
Bentley solutions provide systemwide approach to utility management at Baltimore Gas and Electric
Baltimore Gas & Electric Company (BGE) invested $37 million and five years in developing an enterprise-class geospatial data repository and associated applications. The system supports
>> 更多 |
 |
 |
2007 BE Award Winner: North China Power Engineering (Beijing)
Building Up NCPE Content Management Platform With ProjectWise as the Core
North China Power Engineering (NCPE) needed a well-managed design, information exchange, and publication process that would be traceable and satisfy quality-control requirements. In addition, the
>> 更多 |
 |
 |
AEM Torino Plugs into a Geospatial Environment
Italian multi-utility AEM Torino creates a central database that houses its CRM, SAP, and GPS data using Bentley’s MicroStation, MicroStation GeoGraphics, Bentley Descartes, Bentley Publisher and Bentley Connector for MySAP.com
One of Italy’s largest multi-utilities is one of the first in the world to implement an integrated, seamless geospatial database to manage its CRM, SAP,
>> 更多 |
 |
 |
2007 BE Award Finalist: swb Netze GmbH and Co KG
sisNET and Digital Works with MicroStation Descartes in ProjectWise
The public utility company of Bremen, Germany, supplies electricity, water, gas, and district heating to more than 540,000 customers. In the 1990s, swb had incomplete
>> 更多 |
 |
 |
IRIDE Energia
Bentley Geospatial Server Enables Cutting Edge Multi-Utility GIS for IRIDE Energia
IRIDE Energia, part of the IRIDE Group, is one of the main Italian multi-utilities comprising companies that manage water, electricity, public lighting, gas and district
>> 更多 |
 |
 |
2005 BE Award Winner: HJ Banks & Company Ltd
Planned Development - Shotton Surface Mining Project
The Lady of the Lake A different slant will be given to ’Nature Walks’ following the completion of the Shotton surface mining project
A surface mining
>> 更多 |
 |
 |
利用集成三维模型,设计安全紧凑型工厂
利用集成三维模型,设计安全紧凑型工厂
利用集成三维模型,设计安全紧凑型工厂
如期完成黄金提炼加工厂的设计工作,使业主成功把握商机
多米尼加共和国的 Pueblo Viejo 金矿,是一座某国营公司停止经营近 9 年的金矿,Barrick Gold 公司正在着手开发这一投资 27 亿美元的采矿项目,在该金矿 25 年的开采期内将会提供 1,000 个以上的就业机会。并在最初经营的五年里,新工厂处理黄金矿石的生产率可达每天 24,000 吨,年黄金产量接近 100 万盎司。
作为这个加勒比海小国最大的外商投资项目,此项目有望成为拉动该国经济增长与发展的动力。据世界银行报告,目前在多米尼加共和国 15 至 24 岁的青少年中有三分之一的人口处于失业状态,农村地区有百分之四十五的人生活在贫困中。
如果 Pueblo Viejo 在
>> 更多 |
 |
 |
2007 BE Award Finalist: CH2M Hill
HOLCIM Cement Plant
One of the world’s largest cement plants is being designed by CH2M HILL. The plant is situated on 3,900 acres along the Mississippi River in
>> 更多 |
 |
 |
2007 BE Award Finalist: Hatch Associates Pty Ltd
HATCH workSMART Data-Centric Environment
Proven on projects across Australia, South Africa, Chile, and Canada, the Hatch WorkSMART Data-Centric Environment has become a corporate standard for data-centric project execution. It
>> 更多 |
 |
 |
A Forward-looking Philosophy
VECO Alberta Ltd.’s use of PlantSpace on Shell’s proposed Athabasca Oil Sands Project is resulting in a much more efficient design and engineering cycle
VECO, in a collaborative effort involving several other engineering firms, is working on the Athabasca Oil Sands Project, led by Shell Canada Limited. VECO is
>> 更多 |
 |
 |
Knowing the Drill
Kvaerner wins major contract on the strength of its IT/IS strategy for engineering, based on PlantSpace and MicroStation
Osberg is likely the most profitable oil and gas field in the world. The Osberg A and B plaforms were originally installed as oil-producing platforms,
>> 更多 |
 |
 |
2007 BE Award Winner: Bechtel
Jamnagar Export Refinery Project
Bechtel is collaborating on the Jamnagar Export Refinery Project (JERP) in India, which has a plot plan bigger than that of London and a target
>> 更多 |
 |
 |
2007 BE Award Winner: VECO Alaska
Conoco Phillips Drill Site Technologies
The VECO Alaska design team simultaneously engineered drill sites CD3 and CD4 for Conoco Phillips Alaska Inc. Tasked with reusing project data to generate several
>> 更多 |
 |
 |
迄今最长的海底天然气输送管道项目
迄今最长的海底天然气输送管道项目
迄今最长的海底天然气输送管道项目
北极接收站的工程师克服气候与工期制约,成功完成项目
在挪威的 Melkoya,尽管 3,000 名工人连续4年在北极忍受着极端恶劣的气候条件,建设巴伦支海上第一个离岸天然气生产设施,但始终收效甚微。该项目位于世界最北端城市哈默菲斯特以北 140 公里,耗资 75 亿美元,是一座可以远程操控的海底设施,通过海下管道向 Snohvit 液化天然气接收站输送天燃气。
Snohvit 项目包括 Snohvit、Albatross 和 Askeladd 三个气田,均位于巴伦支海地区的哈默菲斯特盆地内。Snohvit 油田于 1984 年首次被发现,目前预计可开采天然气的储量可达 1930 亿立方米,凝析物 1 亿 1 千 300
>> 更多 |
 |
 |
可持续性油田开发助力实现西伯利亚社区繁荣
可持续性油田开发助力实现西伯利亚社区繁荣
可持续性油田开发助力实现西伯利亚社区繁荣
多位专家协同工作,成功缩短设计时间,减少错误,提高工程质量
如果汉特曼西是一个国家,那么它将成为在石油生产行业中仅次于沙特阿拉伯的全球领导者。这一俄罗斯联邦的自治区位于遥远的西伯利亚地区,该地区的石油天然气产量可以满足人口增长 7.2% 的需求。在这片远离莫斯科3,000公里的亚北极地区居住和工作着 60,000 热情的居民,他们的薪资是全国平均水平的三倍。定居在这一地区的家庭也受益于通过与石油公司开展的社会性合作而资助兴建的完备的基础设施。
《圣彼得堡时报》报道,在过去十年中,该地区的中心地带已由原来只有两层木质建筑的小镇变成了一个繁华城市,高层公寓大楼、学校、大学、科研机构、博物馆、音乐厅、溜冰场以及滑雪中心等应有尽有。尽管一些持怀疑态度的人曾质疑,支持俄罗斯偏远地区大力发展经济是否明智,然而那些曾在汉特曼西生活过的居民可以肯定,改善西伯利亚地区的生活确有其价值。
该地区的经济中心是 Priobskoye 油田,它位于首府城市(即汉特曼西)以东 65 公里处的 Ob 河两岸。在 5,466 平方公里的广阔油田中,有四分之三的区域曾由国有石油公司Rosneft控制,现在属于 Yuganskneftegaz 公司所有。Yuganskneftegaz 在 2000 年开始接手油田,有望在 2010 年达到最高产能,每天产油 500,000 桶。专家预计在 45
>> 更多 |
 |
 |
The Cold, Hard Truth
SALOF Refrigeration lowers costs and strengthens job bids with Bentley AutoPLANT software
For more than two decades, New Braunfels, Texas-based SALOF Refrigeration has been meeting the needs of its global customer base by delivering the most innovative
>> 更多 |
 |
 |
Total
Total E&P Nederland B.V. gains faster access to geologic data, improving oil exploration and production decisions
When geoscientists need to make a decision, time is often at a premium. An oil company may be facing a tight deadlineon a competitive bid
>> 更多 |
 |
 |
2007 BE Award Finalist: Aker Kværner
Integrating ProjectWise in Engineering Data Workflow
At Aker Kvaerner, the engineering environment in maintenance, modification, and operations traditionally used separate systems to handle the many different types of project data. At
>> 更多 |
 |
 |
水电站大坝利用可再生能源助力经济持续发展
水电站大坝利用可再生能源助力经济持续发展
水电站大坝利用可再生能源助力经济持续发展
建设水电站是满足中国能源持续增长需求的战略性组成部分
白鹤滩大坝高 277 米,预计将于 2020 年竣工,届时它将成为中国坝体最高、世界上排名第四的水电站大坝。188 亿立方米的库容量和 12,000 兆瓦的装机容量将使这个耗资 131 亿美元的超大型项目与世界上最大的水电站、装机容量为 18,200 兆瓦的著名三峡大坝相媲美。
白鹤滩大坝位于云南省的金沙江上,它的建设是为了满足中国能源持续增长的需求,而在长江上游和支流建设十二个阶梯电站也是为了满足这一需求的战略性组成部分。白鹤滩水电站将作为金沙江上其他三个在建的水电站 — 溪洛渡、乌东德和向家坝水电站的补充。竣工后,这四个水电站的总发电量将达到三峡电站的两倍。
中国的用电量在近几年稳步增加,从 2000 年到 2004 年增加了 60%,2005 年更是猛增了 15%,从而导致了限电政策的出台。燃煤电厂的发电量占中国电力总供应量的 78%,但对环境的影响非常大。中国对煤炭的依赖导致了空气污染和酸雨现象,同时也加剧了全球变暖。
根据国际能源机构的统计,中国是世界上最大的二氧化碳排放国。作为可产生较少排放的替代能源,水力发电现在为中国供应
>> 更多 |
 |
 |
2007 BE Award Winner: North China Power Engineering (Beijing)
Building Up NCPE Content Management Platform With ProjectWise as the Core
North China Power Engineering (NCPE) needed a well-managed design, information exchange, and publication process that would be traceable and satisfy quality-control requirements. In addition, the
>> 更多 |
 |
 |
Monsanto
3D modeling improves teamwork in demanding powerhouse renovation
When a Midwestern college took a look at its need for a system of four new boilers in a 100-year-old facility, it was more than
>> 更多 |
 |
 |
Tapping New Resources
Offshore oil engineers use Bentley solutions to collaborate from offices on two continents
Just 42 miles off Scotland's Atlantic coast, the rich Clair oil field seemed tantalizing but out of reach since its discovery in 1977. The reservoir's
>> 更多 |
 |
 |
Foster Wheeler Energy
Providing global data access with ProjectWise
Foster Wheeler Energy, a division of one of the world’s largest engineering and construction firms, implemented ProjectWise to create a project intranet for streamlined, dynamic
>> 更多 |
 |
 |
2005 BE Award Winner: InterGen
Fast, broad-based access to plant data saves millions by reducing downtime
Outages are costly to a company such as Massachusetts-based InterGen, which operates power generation facilities on four continents. When a plant goes down, the company
>> 更多 |
 |
 |
The Cold, Hard Truth
SALOF Refrigeration lowers costs and strengthens job bids with Bentley AutoPLANT software
For more than two decades, New Braunfels, Texas-based SALOF Refrigeration has been meeting the needs of its global customer base by delivering the most innovative
>> 更多 |
 |
 |
2007 BE Award Winner: Southern Co. Services
Plant Wansley Units 1-2 FGD Addition
Plant Wansley in Carrolton, Georgia, has two coal-fired boiler units and two combined cycle gas-fired units. Units 1 and 2 are being retrofitted with one
>> 更多 |
 |
 |
RITES Rail User Story
Against the Odds: 3D Visualization Helps Forge a Railway Through the Remote Hills of the Himalayas
The new Kashmir Railway will add an additional 290 kilometers to the largest rail network in Asia, which already measures more than 64,000 route kilometers
>> 更多 |
 |
 |
Banverket's Track Record
A managed environment built on Bentley technology helps Sweden's rail agency move fast and cut costs
To help maintain and upgrade more than 14,000 kilometres of track, Swedish rail authority Banverket applied Bentley solutions to build a managed environment for engineering
>> 更多 |
 |
 |
High Speed Rail Cuts Travel Time in Half
MicroStation helps integrate design data from 15 disciplines
The Channel Tunnel Rail Link will connect London with the Channel Tunnel, speeding passengers from London to Paris in just more than two hours –
>> 更多 |
 |
 |
2007 BE Award Finalist: Movares Nederland BV
Introduction of a Data Management System
With 1,200 employees, Movares is the market leader in railway engineering in the Netherlands. At one point, 350 signaling engineers, 200 construction engineers, and 650
>> 更多 |
 |
 |
Urban Ecology
Scandiaconsult plans a new transportation system for Stockholm, helping the city reclaim a healthy environment from an inner-city industrial wasteland.
Bentley products are enabling the design of transportation infrastructure within an ambitious new urban redevelopment project in Stockholm, Sweden, where the focus is on the
>> 更多 |
 |
 |
Mott MacDonald - East London Line Project
2007 BE Award Winner: Mott MacDonald Ltd – East London Line Project
This project will connect Highbury and Islington Station on the North London Line with a connection into the Network Rail infrastructure in South London. The
>> 更多 |
 |
 |
协同工具加速中国铁路电气化系统设计
协同工具加速中国铁路电气化系统设计
协同工具加速中国铁路电气化系统设计
京沪高速铁路的远大目标是超过日本、法国和德国现有的铁路线,成为世界上最长的高速铁路
在京津城际高速铁路 115 公里的铁路线上,一辆试运营的中国铁路高速列车曾创下了每小时 394 公里 (kph) 的记录。27 分钟的车程使中国成为掌握高速列车技术的少数国家之一,数百万乘客将受益于这一高能效的环保交通方式。
8 月份在北京奥运会期间完全投入运营的京津城际铁路,是全长为 1,318 公里的京沪高速铁路的第一段,而后者是 2020 年中国铁路长期规划中建设总长超过 12,000 公里、时速达到或超过 200 公里的客运专线的一部分。
京沪高速铁路现在是中国最大的资本建设项目,目前造价约 316 亿美元。到 2013 年竣工后,这条高速铁路将使京沪之间的车程从 14 小时缩短到 5
>> 更多 |
 |
 |
North Carolina DOT: Interstate 26
Using MicroStation and GEOPAK, NCDOT was able to address unique construction and environmental challenges while creating a cost-effective design
It has been called one of the last great earthmoving projects in the United States—I-26 through North Carolina’s Appalachian Mountains. North Carolina Department of Transportation
>> 更多 |
 |
 |
Kentucky Transportation Cabinet: I264 at Westport Road
The Kentucky Transportation Cabinet central office design team applied their experience with InRoads and MicroStation to the content management capabilities of Bentley ProjectWise for change control of all project files and better project communication
When the Kentucky Transportation Cabinet inherited this interchange and expansion project, it was three years behind schedule, surrounded by rapid suburban growth and documented by
>> 更多 |
 |
 |
2007 BE Award Winner: HNTB
TrueViz OnTarget
Developed in partnership with the Range and Training Land Program of the U.S. Army Corps of Engineers, TrueViz OnTarget maximized the efficiency of planning and designing
>> 更多 |
 |
 |
2007 BE Award Winner: The Banks Group
Centralized Data Storage Using StartPoint and Riverbed WAN Optimization
The Banks Group needed real-time access to design and office documents at many locations. In the past this was achieved using remote copy procedures or
>> 更多 |
 |
 |
Pave and Prosper
Halcrow uses Bentley MXURBAN to speed and optimize reconstruction design
A two-person team at Halcrow’s Gloucester office handled the design for a £250,000 upgrade to less than one kilometer of the A419/A417 route linking Cricklade
>> 更多 |
 |
 |
Roadwork in Progress
A managed environment for engineering data helps accelerate Kentucky highway projects
Highway planner Tom Clouse has no doubt: "This project just wouldn't have gotten done" without the power of a managed environment for engineering data, built
>> 更多 |
 |
 |
Water Works
2002 sees the opening of the historic Rochdale Canal
The Rochdale Canal was constructed between 1794 and 1804 in order to carry heavy cargo 55 kilometres from Sowerby Bridge to Manchester. In its heyday,
>> 更多 |
 |
 |
A New Corner of Copenhagen
RAMBØLL uses a managed environment built on Bentley solutions to help lay the groundwork for a 30-year growth plan
Looking south of the centuries-old center of Copenhagen, city planners envisioned a modern section of town built from the ground up: more than 765 acres
>> 更多 |
 |
 |
2007 BE Award Finalist: SWECO
Norra Länken
Norra Länken is a three-kilometer, four-lane highway tunnel in northern Stockholm, Sweden. It is the next link in the circular highway system already underway around
>> 更多 |
 |
 |
2005 BE Award Winner: CH2M Hill
New Technology Adoption - Marquette Interchange Design Automation
The Marquette Interchange is an $800 million freeway interchange reconstruction project currently underway in Milwaukee, Wisconsin. More than 50 bridge structures in the project include
>> 更多 |
 |
 |
2007 BE Award Finalist: India International Infrastructure
Planning, Design and Construction of Peripheral Ring Road for Bangalore City
The $185 million Peripheral Ring Road project encompasses the southern part of Bangalore City, India, connecting seven major radial roads consisting of three national highways,
>> 更多 |
 |
 |
Ruling the Road
Engineers at MWH speed up urban renewal road productivity with MXURBAN
Engineers in a New Zealand office of MWH reaped large productivity returns when they began using Bentley MXURBAN for urban renewal road projects. MWH, which
>> 更多 |
 |
 |
2007 BE Award Winner: Scott Wilson Kirkpatrick (India) Pvt Ltd
Feasibility and Detailed Project Report for 4/6 Laning of Hyderabad-Vijayawada and Vijayawada-Machlipatnam
The project involved a section of NH-9, which is part of India’s National Highways Development Project’s North–South–East–West Corridor. It encompassed two stretches of road (km160/000
>> 更多 |
 |
 |
Beyond Design
Earth Tech uses technology to enhance communication on IH-35
Growth in population and commerce has tested the capacity of many major thoroughfares in Texas, and Interstate Highway 35 (IH-35) through Austin is no exception.
Earth
>> 更多 |
 |
 |
Making the Road Safe for Travelers
Bentley products help create barriers against lethal rockfalls
Scenic, winding Chapman’s Peak Drive was a popular route for South African tourists and commuters – until boulders began dropping from the mountainsides above.Wildfires stripped
>> 更多 |
 |
 |
Circles and Strings
Bentley MX helps rescue the ruins of Stonehenge
The ancient monument of Stonehenge is one of the world’s most important archaeological areas. A management plan has been developed to safeguard this World Heritage Site
>> 更多 |
 |
 |
建设道路枢纽 古道变通途
建设道路枢纽 古道变通
西南大道成为改进美国德克萨斯州基础设施的核心项目
建设道路枢纽 古道变通途
西南大道成为改进美国德克萨斯州基础设施的核心项目
提高基础设施对于改善生活水平起着至关重要的作用。由美国北德州收费公路当局负责建造和运营的西南大道即将担此重任。建成后,这条耗资 9.25 亿美元,长 8.2 英里的六车道公路将有效缓解沃茨堡市郊不断加剧的交通拥堵状况,从而改善当地通行条件。此外,这条大道还将改善空气质量并保障道路安全。
按照规划,沃茨堡核心商务区 IH-30 路段的收费公路届时将延长至沃茨堡西南方,并与约翰森郡长达 13 英里的奇泽姆牛车道项目连通起来。本项目还将在 IH-20 上的 SH-183 路段建成一座五星级立交桥。规划中的立交桥包括一条长达 2 英里的新公路,西南大道上铺设六车道主路并设立局部收费路段,在 SH-183 路段进行 1 英里以上范围的重修,设立新的收费路段以及通往 IH-20 的直行通道。
这一交通枢纽还包括 9 个直行通道,15
>> 更多 |
 |
 |
Keeping Venice Afloat
To help keep Venice afloat and restore the fragile ecosystem of the surrounding Venice Lagoon, CREA is using complex mathematical models that work within MicroStation
Venice is in danger of slowly disappearing under the waves of the lagoon upon which it was built twelve hundred years ago. Complex mathematical models
>> 更多 |
 |
 |
Copper Coast Water Supply System upgrade capitalizes on WaterGEMS
Water distribution modeling software provides South Australian Water Corporation with efficiency and time savings for model building, design and analysis
The Copper Coast water supply system serves a permanent population of approximately 10,000 people in three townships; Kadina, Moonta and Wallaroo on the Yorke Peninsula
>> 更多 |
 |
 |
Linking City of Bethlehem's SCADA System to WaterCAD
The Engineers at the City of Bethlehem Public Works Department use SCADA data to provide for better operator training, real-time system control, energy cost reductions, emergency response planning, and forensic analyses
Water Distribution Modeling and SCADA (Supervisory Control and Data Acquisition) technology has evolved immensely in recent decades. A few years ago, integrating SCADA with a
>> 更多 |
 |
 |
3D Model of Wastewater System Reduces Design Time
Process Plus reduces errors and field rework using AutoPLANT Explorer/ID on a $6.5 million wastewater treatment facility
Before the advent of 3D software, errors found in drawings would delay construction time by requiring rework in the field.With today’s technology, the digital models
>> 更多 |
 |
 |
2007 BE Award Finalist: Camp Dresser and McKee
St. Augustine LPRO Water Treatment Plant
The increasing maintenance of an aging lime-softening water treatment plant represented a financial and reliability risk for the City of St. Augustine, Florida. Consequently, the
>> 更多 |
 |
 |
3D Modeling Helps Ionics Stay Above Water
Ionics designs desalination plants more quickly and with greater accuracy—slashing design time by two-thirds—using Bentley® AutoPLANT
Ionics, Incorporated, is a global separations technology company specializing in membranes used for purification, concentration, treatment and analysis of water, including wastewater and ultrapure water.
>> 更多 |
 |
 |
2007 BE Award Winner: Dutch Ministry of Finance
Geospatially Enabling the Dutch Ministry of Finance
The goal of Dutch Ministry of Finance’s project was to create an integrated GIS-SAP solution that would provide administrative and geospatial data in one user
>> 更多 |
 |
 |
Tracy Wastewater Treatment Plant
The Tracy Wastewater Treatment Plant (WWTP)
The Tracy Wastewater Treatment Plant (WWTP) Phase 1B expansion project involved a complex engineering design to upgrade and expand existing facilities constructed in the 1950s.
>> 更多 |
 |
 |
2007 BE Award Finalist: Federal Aviation Administration
Nation-wide FAA Standard Engineering Drawing Management System with ProjectWise
The Federal Aviation Administration (FAA) needed to deploy a single, enterprise drawing management system that could roll forward years of legacy data and mitigate the
>> 更多 |
 |
 |
2007 BE Award Winner: ISKI Genel Mudurlugu
Infrastructure Integration of Mega City—Istanbul
In water and sewerage system management, most activity is related to geographical references. The ISKABIS project’s goal was to provide an effective means for users
>> 更多 |
 |
 |
USFilter Electrocatalytic Products
USFilter Electrocatalytic Products (USFEP)
USFilter Electrocatalytic Products (USFEP), a group within USFilter, recently made the decision to integrate Bentley MicroStation and plant design solutions to improve quality, meet schedules,
>> 更多 |
 |
 |
Atkins Water - Bolton Wastewater Treatment Works
2007 BE Award Winner: Atkins Water – Bolton Wastewater Treatment Works
The Bolton Wastewater Treatment Works project is a $78.5 million improvement scheme that includes significant refurbishment works on the existing plant. Construction work consists of
>> 更多 |
|