Project

Patnow Power Plant

Organization

Energoprojekt-Katowice S.A. (EPK)

BE Awards category

Plant Managed environment

Project objectives

Design and construct a $480 million, 460 megawatt electrical generator.

Fast facts

EPK created a single 3D model that helped keep project information up to date, facilitated tracking and reporting project changes, and helped avoid errors and inaccuracies. Savings included reductions of 15 percent to 20 percent in design time, 5 percent in material costs, and 10 percent in fabrication and erection costs.

Bentley products used

  • MicroStation
  • TriForma Extension for MicroStation
  • Bentley Structural

Energoprojekt-Katowice S.A. (EPK) is no stranger to heavy industrial and power plant design. Founded in 1949, the multidisciplinary engineering design firm has designed more than 100 power plants built in Poland and abroad, and is now the largest engineering company in Poland.

So when the Patnow-Adamow-Konin Power Plants Group – one of Poland’s largest producers of energy – began a complete rehabilitation project of the Patnow Power Plant in 2001, they naturally called on EPK’s expertise. The rehabilitation project was divided into six main parts. Foremost was the design and construction of a $480 million lignite-fired supercritical energy unit, capable of generating 460 megawatts of electrical power.

EPK was responsible for the basic and detail engineering designs of the steel and civil structures for this unit and, in particular, a boiler house contained within. Their designs involved modeling, space coordination, and static calculations such as structural and stress analysis.