Planning, Sequencing, Execution and Monitoring of Construction Activities


Vantagens

Planning

Reduces time and costs associated with performing material take-offs and translating construction documents into action.

Increases productivity through generation and sequencing of optimal weekly work plans at a crew level.

Improves communication and coordination with fabricators on priorities and onsite deliveries.

Streamlines the planning and management of systems turnover and testing.

Status Tracking

Improves decision making through an ability to visually monitor construction status against the project schedule.

Enables greater control over the scheduling and monitoring of design and procurement activities to meet the needs of construction and operations sequencing.

Reporting

Enables the project team to rapidly produce detailed and accurate estimates of labor and cost as design data becomes available.

A flexible reporting system can display information about user-defined groups. For example:

  • Bill-of-material
  • Work steps for construction
  • Shortage lists
  • Progress and status information.

Organization

Re-organizes the engineering CAD model based on user specified attributes. For example:

  • Area
  • Services systems
  • Bore Size
  • Material or Spec.

Substantially improves the ability to make the transition from construction by areas to systems for testing and turnover.

4D Playback

Links to project schedule to model components.

Reduces rework by enabling the project team to catch mistakes in the virtual model prior to the release of work to the field.

Simulates various schedule scenarios enabling users to create the most efficient and effective schedules.

Steel Module

Supports seamless data translation from steel design packages.

Supports steel workflow through design, fabrication, delivery and construction.

Simplifies task level planning and improves communication through an intuitive interface and visualization for hang lists (work sequences of individual steel pieces).