Project Objectives

  • Conversion of two oil platforms into gas platforms
  • Delivery of as-built drawings and complete documentation of the facility, in an industry-standard format, for life cycle management and ultimate destruction of the facility 

Fast Facts

  • Complex project IT based on Windows NT and Oracle
  • Bentley software was incorporated into the project IT without customization

Bentley Products Used

  • Bentley Navigator
  • PlantSpace P&ID
  • MicroStation
  • Bentley Facilities Manager

Osberg is likely the most profitable oil and gas field in the world.  The Osberg A and B plaforms were originally installed as oil-producing platforms, but needed to be converted to gas drilling.

The Kvaerner team had to respond to requirements for the entire project life cycle -- through design, installation, management and decommissioning of part of the site. It investigated a large number of software products for each aspect of the project, as well as the vendors who develop them - and chose Bentley.