This eSeminar addresses the Highway A4 project in Poland (Cracow-Tarnow).
Wojciech Nawrocki of KBPDiM Transprojekt Kraków in Poland talks about how the team used a minimum expenditure of work and time to complete design of the road. The vast majority of the work was carried out by template with advanced component display rules.
The result:
- Complete design for rebuilding the road.
- Drawings, especially cross section, were completed with minimal preparation.
- The designer can concentrate on design problems.