AutoPLANT User Videos - Browse by Industry
Power Generation
Desein Pvt. Ltd. - 2010 Be Inspired Awards Nominee
Project Name: Mudra
Location: Mundra Port, Gujarat, Gujarat, India
Products Used: AutoPLANT Equipment, AutoPLANT Piping, and AutoPLANT Raceway.
Benefits/ROI:
ESI Inc. of Tennessee - 2010 Be Inspired Award Winner
Project Name: Department of Energy - Biomass Cogeneration Facility
Location: Aiken, South Carolina, United States
Products Used: AutoPLANT Equipment and AutoPLANT P&ID
Benefits/ROI:
- Use of 3D models
- More effective means of communication
- Maximized the use of available space
- Lowered vendor costs and field rework cost
- Saved thousands of man-hours
- Decreased travel
Process Manufacturing
Grontmij Industry - 2010 Be Inspired Award Winner
Project Name: Fully Automatic Production unit for Sika
Location: Zwijndrecht, Antwerp, Belgium
Products Used: AutoPLANT Equipment and AutoPLANT Piping
Benefits/ROI:
- 3D was used as a design
- Collaboration and procurement tool
- Work was understandable and clear for all contractors
- Limited document hand over
- Contractor's bidding time was decreased
- Shortened procurement processes
Royal Haskoning - 2010 Be Inspired Award Finalist
Project Name: Vopak Tank Terminal Expansion Project
Location: Rotterdam, ZH, Netherlands
Products Used: AutoPLANT Equipment and AutoPLANT Piping
Benefits/ROI:
- Easily integrated into the overall layout
- Accurate and well-designed 3D models
- Achieved budgeted man-hours
- Excellent quality of final output
- Colloration of design team from multiple locations
PMP Ltd. - 2010 Be Inspired Award Nominee
Project Name: Izomerization Unit Syzran Refinery
Location: Syzran, Russian Federation
Products Used: AutoPLANT Equipment and AutoPLANT Piping
Benefits/ROI:
- Comprehensive software solution for the infrastructure
- Accelerated the design process
- Simple solution to complex engineering problem
- Improved communication across project teams
Structural Engineering
Pan American Energy LLC - 2010 Be Inspired Award Nominee
Project Name: Modularization of Facilities
Location: Comodoro Rivadavia, Chubut, Argentina
Products Used: AutoPLANT Equipment, AutoPLANT Piping, and AutoPLANT P&ID
Benefits/ROI:
- Overall better control of construction
- Engineering time reduced by 7,000 hours
- Cut budget by 3% (USD $250,000) per battery (5 total)
- Construction completed 3 months ahead of schedule
- Field staff reduced by 30%
- Improved document management