Many of our users have been benefiting from GC on some truly wonderful projects. It's not easy to improve the world. These are some of the best at it.
Case Studies |
| |
 Learn more |
Melbourne Rectangular Stadium Organization: Arup Location: Melbourne, Australia Project Objective: Create a new sports complex for the city of Melbourne to host soccer and rugby matches.
Fast Facts:
- Seating for 31,000
- Unobstructed sight lines for fans
- 50% less steel in roof vs. conventional stadium roof
- Bio Frame roof based on the inherent structural efficiencies of the Buckminster Fuller geodesic dome
- Structure will be clad in a triangular panelized façade made up of a combination of glass, metal, and louvers
- Rain water harvesting system
- Project completion date December 2009
|
 Learn more |
The Lagoons Organization: Thompson, Ventulett, Stainback & Associates Location: Dubai, UAE Project Objective:Mixed-use development
Fast Facts:
- Site development consists of 7 islands
- 70 million sq ft of building space
- The four towers:
- Ranging from 54 to 97 floors designed to represent the movement of candlelight
- Over 6 million sq ft of office, hotel, and residential space
- Base podium of the business district can hold 35,000 automobiles
- Each floor plate is unique to itself
|
 Learn more |
Point B Design Organization: Point B Design Location: Gladwyne, Pennsylvania, United States Project Objectives:
- House private art collection in an environment that responds to changes in the interior and the exterior environment
- Design a system of display components that deploy throughout the gallery’s lifecycle
- Design a programmable lighting system that can shift over periods ranging from seconds to 16 days
- Generate an expanded set of design considerations to explore legitimate constellations of building solutions
- Analyze numerous changes in each design iteration
Fast Facts:
- Point B Design employed multiple design strategies to accomplish primary objective
- The building and surroundings were analyzed for levels of permanence and adaptability
- An emergent display system interweaves new configurations and experiences that are responsive to the environment
- The display system is based on a kit of parts
|
Want to know more? Contact us to request additional information and speak with a Bentley sales specialist.