RAM Structural System Cuts PEC’s Total Design and Revision Time Almost in Half
Professional Engineering Consultants, Ltd., (PEC) is a small engineering firm specializing in low- to mid-rise commercial, industrial, and residential buildings. Located in Amman, Jordan, the 15- to 20-person office serves clients in the Middle East, where owners are notorious for shopping around for the best pricing on available materials after a design concept has been approved. It is not unusual for a client’s material selections to significantly alter the building design, so being able to make changes quickly and easily is crucial.
|
|

|
Baylor Medical Pavilion
Employee-owned architectural, engineering, and consulting firm HDR Architecture was selected to design and engineer the structural, mechanical, and electrical aspects of the seven-story, 185,000-square-foot Baylor Medical Pavilion. Challenges faced with this office building and parking structure project included the need to evaluate and price multiple structural framing options, work under a compressed design schedule of five months, and repeatedly evaluate post-construction structural modifications as required by tenants. |
 |
Gresham, Smith and Partners Uses Process Innovation to Deliver Nissan America’s New Corporate Facility Ahead of Schedule
Before Nissan North America, Inc. moved its headquarters to Franklin, Tenn., it contacted Gresham, Smith and Partners (GS&P) to plan and design its new 11-story, 550,000-square-foot office building. The $110 million facility sits on a 50-acre site and includes a 1,100-car parking garage. |
|

|
Medical Institute Sacramento, California
Thanks to RAM Structural System software, Anderson Doig, an engineering firm based in Sacramento, California, was able to meet the tight schedule on the $50 million project for a major medical institute in Sacramento, California. |
|

|
Civic Center Office Building, Denver, Colorado
Martin/Martin estimates that it eliminated 1200-1800 hours of design engineering time thanks to the software – a cost savings of $165,000 over the course of designing the Civic Center Office Building. “RAM is a huge timesaver,” boasts Tim Lack, an associate at Martin/Martin. |
|

|
Bala Consulting Engineers, Inc., Wynnewood, Pennsylvania
The five structural engineers at Bala Consulting use the RAM Structural System on most projects that come through the door. The types of projects that Bala Consulting designs using RAM Structural System are varied, from one-story to eleven-story office buildings and even industrial platforms. |
|

|
Isbell Engineering Group, Inc., Sanger Texas
In the midst of a lengthy search for a software program to replace its prior engineering software as its office standard, Isbell Engineering – whose typical job is designing a $2-$15 million institutional structure – found that replacement in the RAM Structural System. Isabell Engineering has since witnessed a remarkable growth in productivity and output. |
|

|
Second Nature Modern Steel Construction Article November 2008
Harley Ellis Devereaux leverages available technology, electronically transferring the Revit Structure model into RAM Structural System. The interoperability between the two programs allowed the engineers to transfer all of the design information back and forth with the push of a button. |
|

|
Blossoming Knowledge Modern Steel Construction Article January 2009
Awareness of the history of the Holocaust grows from a flower-like building at the University of Maine at Augusta. RAM Steel was used to complete the steel framing for this structure.
|
 |
School Days Modern Steel Construction Article January 2009
The RAM Structural System was used to design an attractive, elaborate new Florida high school. |
|
|
|